BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART;VALUE=DATE:20110720
DTEND;VALUE=DATE:20110721
TRANSP:TRANSPARENT
X-MICROSOFT-CDO-ALLDAYEVENT:TRUE
SUMMARY:Major Road Work @ N. Harbor Blvd.
DESCRIPTION:Construction is set to begin Wednesday\, July 20\, on street improvements on Harbor Boulevard and Bastanchury Road as part of the St. Jude Medical Center Expansion Project.\n\nThe work is expected to be completed in March\, 2012.\n\nThe project will include:\n\n\n	\n		Replacement of the retaining wall\, landscaping\, sidewalk\, and curb and gutter along the St. Jude frontage on Harbor.  \n	\n		Construction of a northbound right-turn lane on Harbor at Bastanchury.\n	\n		Extension of the median island on Bastanchury\, east of Harbor.\n	\n		Pavement reconstruction of the northbound lanes on Harbor\, between Valencia Mesa Drive and Bastanchury.\n\nNorthbound traffic lanes on Harbor will be reduced for the duration of the construction period\, and motorists are advised to take alternate routes.\n\nExtra steps will be taken to minimize impact of the project on businesses\;  however\, noise and vibrations may be experienced in the project area due to the construction activity.\n\n\n\nSt. Jude Medical Center is funding the improvements.\n\n\n\nFurther information about the project may be obtained by calling the City of Fullerton Engineering Department at (714) 738-6845.
X-ALT-DESC;FMTTYPE=text/html:<span style="font-size: 12px"><span style="font-family: arial">Construction is set to begin Wednesday\, July 20\, on street improvements on Harbor Boulevard and Bastanchury Road as part of the St. Jude Medical Center Expansion Project.<br />\nThe work is expected to be completed in March\, 2012.<br />\nThe project will include:</span></span><br />\n<ul>\n	<li>\n		<span style="font-size: 12px"><span style="font-family: arial">Replacement of the retaining wall\, landscaping\, sidewalk\, and curb and gutter along the St. Jude frontage on Harbor.&nbsp\; </span></span></li>\n	<li>\n		<span style="font-size: 12px"><span style="font-family: arial">Construction of a northbound right-turn lane on Harbor at Bastanchury.</span></span></li>\n	<li>\n		<span style="font-size: 12px"><span style="font-family: arial">Extension of the median island on Bastanchury\, east of Harbor.</span></span></li>\n	<li>\n		<span style="font-size: 12px"><span style="font-family: arial">Pavement reconstruction of the northbound lanes on Harbor\, between Valencia Mesa Drive and Bastanchury.</span></span></li>\n</ul>\n<span style="font-size: 12px"><span style="font-family: arial">Northbound traffic lanes on Harbor will be reduced for the duration of the construction period\, and motorists are advised to take alternate routes.<br />\nExtra steps will be taken to minimize impact of the project on businesses\;&nbsp\; however\, noise and vibrations may be experienced in the project area due to the construction activity.<br />\n<br />\n<span style="color: black">St. Jude Medical Center is funding the improvements.</span><br />\n<br />\nFurther information about the project may be obtained by calling the City of Fullerton Engineering Department at (714) 738-6845.&nbsp\;</span></span><br />\n
LOCATION:
UID:e.887.4458
SEQUENCE:3
DTSTAMP:20260430T093425Z
URL:https://nocchamber-gzcms.preview.gochambermaster.com/events/details/major-road-work-n-harbor-blvd-4458
END:VEVENT

END:VCALENDAR
